
Phase 1 Initial test for proposal
Provide feed stock (at clients expense) to our testing facility to determine Syn-Gas
BTU Value, and ash content.
Fill out the PDF form here and provide check payable to CCT
MKTG LLC for test scheduling date
Phase 2 Alcohol Conversion Test, power conversion
test, or NG test.
Provides the client with desired designer gas ASTM ratings
or power output of related feed stocks.
Fill out separate PDF form.
Phase 3 MPR engineering
Operational requirements and design phase provided by MPR
and associates Inc.
1-877-CCTMKTG Ext 702
|