Phase 1 Initial test for proposal
Provide feed stock (at clients expense) to our testing facility to determine Syn-Gas BTU Value, and ash content.

Fill out the PDF form here and provide check payable to CCT MKTG LLC for test scheduling date

Phase 2 Alcohol Conversion Test, power conversion test, or NG test.
Provides the client with desired designer gas ASTM ratings or power output of related feed stocks.

Fill out separate PDF form.

Phase 3 MPR engineering
Operational requirements and design phase provided by MPR and associates Inc.

1-877-CCTMKTG Ext 702

 

Website Design by: HWS. All rights reserved. Login